Monarch Gold intersects 3.33 g/t Au over 109 metres (358 ft) at its Fayolle gold project
MONTREAL, April 30, 2020 /PRNewswire/ – MONARCH GOLD CORPORATION (“Monarch” or the “Corporation”) (TSX: MQR) (OTCMKTS: MRQRF) (FRANKFURT: MR7) is pleased to report the assay results from the first of seven geotechnical holes in the 2019-2020 diamond drilling program at its wholly owned Fayolle gold project, located 25 kilometres northeast of Rouyn-Noranda, near Monarch’s Camflo mill. The drilling program started in December 2019 and was completed in mid-January 2020, with a total of 1,166 metres drilled in the seven holes. Eight shallow overburden/rock mechanics holes totalling 133 metres were also drilled in the area. The primary purpose of the drilling program was to collect geotechnical data in preparation for an upcoming feasibility study on the Fayolle deposit. The drill core was logged and assayed as part of the study.